Two-leaf industrial gate
An assembly from the SPW archive for applications with blast-protection requirements, presented through its visible configuration and details.
View the record and its evidence limitsSelected photo archive
Explore photographs by activity: welding and piping, steel structures, special doors, access and reconditioning. For a similar application, send us the drawing, dimensions and technical requirements.
01 — About the photographs
Photographs supplied by SPW, organised by activity. Attribution to a named project and protection performance are confirmed through technical documentation. Each enquiry is assessed for configuration, materials and installation conditions.
Work in detail
An assembly from the SPW archive for applications with blast-protection requirements, presented through its visible configuration and details.
View the record and its evidence limitsParticipation in the national gas transmission system in collaboration with Inspet Ploiești S.A., as recorded in SPW’s project presentation.
View the record and its evidence limitsAn example from the company archive: a heavy-equipment component repaired through welding and reconditioning.
View the record and its evidence limits02 — Welding and piping
Joints, welds, work fixtures, pipework and components prepared for execution.
View the service and quotation details
Steel sections and elbows prepared for integration into a piping route.
Image supplied by SPW for the catalogue · project not named
Close detail of a weld bead on a prepared metal surface.
Image supplied by SPW for the catalogue · project not named
Corner made from rectangular hollow sections, with surfaces prepared for the next stage.
Image supplied by SPW for the catalogue · project not named
Fit-up and preparation detail for a steel-section corner.
Image supplied by SPW for the catalogue · project not named
Steel sections cut and aligned for a corner joint.
Image supplied by SPW for the catalogue · project not named
Welded rectangular assembly with a drilled mounting flange.
Image supplied by SPW for the catalogue · project not named
Frame and clamps used to maintain geometry during fabrication.
Image supplied by SPW for the catalogue · project not named
Organised metal pipe stock before cutting or installation.
Image supplied by SPW for the catalogue · project not named
Flange aligned on a pipe section before completion of the joint.
Image supplied by SPW for the catalogue · project not named
Flange and pipe-end geometry checked before welding.
Image supplied by SPW for the catalogue · project not named
Axial view inside a flanged component with a circular joint.
Image supplied by SPW for the catalogue · project not named
Detail of a circular weld on a cylindrical assembly.
Image supplied by SPW for the catalogue · project not named
Close view of a consistent bead on a tubular-component joint.
Image supplied by SPW for the catalogue · project not named
Close detail of the welded joint between pipe and mounting flange.
Image supplied by SPW for the catalogue · project not named
Longitudinal bead along the edge of a rectangular steel assembly.
Image supplied by SPW for the catalogue · project not named
A view from workshop welding and fabrication activity.
Photograph from the company’s existing archive
Technical field execution with the work area organised for the intervention.
Photograph from the company’s existing archive03 — Steel fabrication
Frames, sections, plates and steel assemblies shown at distinct fabrication stages.
View the service and quotation details
Welded rectangular assembly stiffened with diagonal braces and supported on stands.
Image supplied by SPW for the catalogue · project not named
Rectangular structure mounted on a heavy base for fabrication and checking.
Image supplied by SPW for the catalogue · project not named
Large steel frame during assembly and dimensional checking.
Image supplied by SPW for the catalogue · project not named
Rectangular sections and welded frames arranged in batches for fabrication flow.
Image supplied by SPW for the catalogue · project not named
Sections prepared in batches for steel-assembly fabrication.
Image supplied by SPW for the catalogue · project not named
Rectangular and square sections grouped after cutting and before assembly.
Image supplied by SPW for the catalogue · project not named
Plate components cut to shape and drilled for assembly.
Image supplied by SPW for the catalogue · project not named
Detail of a steel member after application of its finish coat.
Image supplied by SPW for the catalogue · project not named
Finished structural member prepared for checking or installation.
Image supplied by SPW for the catalogue · project not named04 — Machining and repairs
Machining, fitting, turning and mechanical-component details from fabrication or repair work.
View the service and quotation details
Machined circular surface in a steel plate, viewed before finishing.
Image supplied by SPW for the catalogue · project not named
Turning of a metal roller or flanged component on a lathe.
Image supplied by SPW for the catalogue · project not named
Steel bracket with pin and bores, prepared for integration into an assembly.
Image supplied by SPW for the catalogue · project not named
Local fit-up and preparation of a plate on a vertical member.
Image supplied by SPW for the catalogue · project not named
Workshop adjustment of a steel component.
Photograph from the company’s existing archive
Heavy-equipment component repaired through welding and reconditioning work.
Photograph from the company’s existing archive
Portable equipment installed on the component for machining and bore restoration.
Image supplied by SPW for the catalogue · project not named
Mounting and alignment of portable equipment through a steel bore.
Image supplied by SPW for the catalogue · project not named
Overview of the equipment setup used to restore a bore on the machine.
Image supplied by SPW for the catalogue · project not named
Internal weld build-up stage before final machining of the bore.
Image supplied by SPW for the catalogue · project not named
Torch positioned for internal weld build-up of the bore.
Image supplied by SPW for the catalogue · project not named05 — Doors and shielding
Technical closures for bunkers, applications with blast-protection requirements and access requiring radiological shielding, presented separately and documented for each project.
View the service and quotation details
Two-leaf swing configuration with heavy external hinges and a central mechanical locking system. Class and performance cannot be established from the photograph and are confirmed only through the project's technical documentation.
Image supplied by SPW for the catalogue · project not named
Side view of the leaves, central mechanism and external hinge points of the same gate at an unnamed site.
Image supplied by SPW for the catalogue · project not named
Close view of the heavy hinge and its connection to the steel leaf. Assembly sizing and verification depend on the technical design.
Image supplied by SPW for the catalogue · project not named
Large sliding gate in an indoor technical space, photographed during work at the base of the panel and along the floor paths. Its attenuation level cannot be established from the image.
Image supplied by SPW for the catalogue · project not named06 — Access and installation
Posts, arms, fixings and details for steel access and installation systems.
View the service and quotation details
Cylindrical bollards arranged in a line along a building within a controlled-access technical area. Their impact class cannot be established from the photograph.
Image supplied by SPW for the catalogue · project not named
Detail view of bollards and delineator posts positioned beside the building and access-related equipment.
Image supplied by SPW for the catalogue · project not named
Batch of painted steel posts prepared for equipment and installation.
Image supplied by SPW for the catalogue · project not named
Painted steel member with a prepared recess for device integration.
Image supplied by SPW for the catalogue · project not named
Rectangular members with mounting plates, finished and prepared for installation.
Image supplied by SPW for the catalogue · project not named
Rectangular cap with sealing layer, prepared for installation in a hollow section.
Image supplied by SPW for the catalogue · project not named
Base plate mechanically fixed to its support with four visible anchors.
Image supplied by SPW for the catalogue · project not named07 — Contact
Send photographs, drawings, dimensions, location and schedule. We will return with the questions needed for a technical assessment.